An Automotive Manufacturing Plant Workshop Cooling Project
--Water-Cooled Screw Chiller + Integrated High-Efficiency Chiller Plant · Fast-Delivery Workshop Climate Control Solution
Project Overview
Located in Changsha, Hunan Province, this project provides cooling for a large automotive manufacturing plant's production workshops, operating throughout the summer. With high demand and an extremely tight delivery schedule, 21 water-cooled screw chillers were required to be delivered within 35 days.
Core Challenges
① No Dedicated Chiller Plant Room: The workshops were not designed with a dedicated chiller plant room, requiring equipment to be placed adjacent to the workshops with extremely compact footprints for each unit;
② Extremely Short Delivery Lead Time: 21 units needed to be manufactured and delivered within 35 days, placing stringent demands on supply chain and production capacity;
③ Limited On-Site Installation Conditions: Construction space around the workshops is constrained, requiring rapid lifting and piping connection, with equipment needing to be operational immediately upon arrival.
The project deploys 21 water-cooled screw chillers as the core cooling source, integrated with variable-frequency pumps, variable-frequency cooling towers, and an intelligent control system. All equipment underwent integrated assembly and system commissioning at the factory, with full system validation completed prior to shipment - ensuring immediate startup upon on-site installation without the need for field commissioning, minimizing on-site work time.

Rapid Delivery & Fast Installation
From order confirmation to equipment arrival, the entire process was completed in just 35 days - all 21 units delivered on schedule. On-site installation requires only lifting, positioning, and piping connection, achieving "same-day positioning, same-day water filling, same-day startup."
Smart Control & Reliable Operation
The system supports one-key centralized control, delivering stable and reliable performance.
Core Value
① Rapid Delivery: 21 custom units designed, manufactured, and delivered within 35 days - demonstrating exceptional supply chain capabilities;
② Quick Deployment: Factory pre-assembly and pre-commissioning enable immediate startup upon installation, significantly reducing on-site construction time;
③ Flexible Installation: Compact unit design allows placement adjacent to workshops without requiring a dedicated chiller plant room, overcoming space constraints.